EX-01

Working

Excavator · Caterpillar 390F (2019) · 8,866 h · Scroggie Creek

Last seen 15:09:44

Digital twin
Live machine view
Work cycle, load, fuel and lamps follow live telemetry. Drag to rotate, scroll to zoom.
Working
Assignment
Feeding WP-1
Operator Helder Ribeiro

Wash plant

s-scr-wp1

Hours today

6.7 h

Cycle time

31s

Cycles today

565

Engine hours

8,866 h

Next service

in 307 h

Telemetry
Live readings

Engine speed

1,719rpm

Coolant

90.4°C

Hydraulic oil

73.5°C

Hydraulic pressure

322bar

Bucket fill

88%

Fuel burn

58.7L/h
Fuel
Tank level
35%

348 L

In tank

58.7 L/h

Burn

5.9 h

Range

Utilisation
Hours on this shift

6.7 h

of a 12 h shift · 56% utilisation

Load

88%

Engine speed

1,719 rpm

Coolant

90 °C

Per hour
Utilisation and fuel burned today
Production day starts at 07:00.

Utilisation · %

Fuel · L

Alarms
Alarms (0)

No alarms on this unit in the last 48 hours.

Engine history
Engine speed, coolant and fuel level

Engine speed · rpm

Coolant · °C

Fuel level · %