Serra de l'Ebre
Needs attentionCatalonia · Wind · 57 MW installed · 5 technicians · manager Firas Cheaib
6.5 MW
11 %
242 MWh
96.6 %
9 / 13
6
Wind
9.6 m/s SW
Irradiance
211 W/m²
Temperature
17.4 °C
Cloud cover
46 %
Conditions
Partly cloudy
Substation
Ascó SE 400 kV
Voltage
401.3 kV
Frequency
49.986 Hz
Power factor
0.975
Curtailment
8 %
Day-ahead price
49.50 €/MWh
Assets
13 assets on site. Open one for its live 3D view.
Wind turbine
WTG-03
Siemens Gamesa SG 5.0-145 · 6.2 MW
Output
1.58 MW
Today
33.1 MWh
Wind
8.3 m/s
Wind turbine
WTG-04
Siemens Gamesa SG 5.0-145 · 5.0 MW
Output
1.35 MW
Today
26.0 MWh
Wind
8.5 m/s
Wind turbine
WTG-05
Siemens Gamesa SG 6.6-170 · 6.2 MW
Output
0.00 MW
Today
11.0 MWh
Wind
7.3 m/s
Wind turbine
WTG-07
Siemens Gamesa SG 5.0-145 · 5.0 MW
Output
0.00 MW
Today
29.0 MWh
Wind
6.5 m/s
Wind turbine
WTG-09
Siemens Gamesa SG 6.6-170 · 6.2 MW
Output
0.13 MW
Today
13.1 MWh
Wind
5.8 m/s
Wind turbine
WTG-10
Siemens Gamesa SG 6.6-170 · 4.2 MW
Output
0.67 MW
Today
23.1 MWh
Wind
7.6 m/s
Inverter skid
INV-01
Sungrow SG3125HV-MV · 4.6 MVA
Output
1.26 MW
Today
19.6 MWh
Availability
99.5 %
Inverter skid
INV-02
SMA Sunny Central 4600 UP · 3.1 MVA
Output
0.52 MW
Today
14.4 MWh
Availability
96.3 %
Blade ice detected
Generator winding temperature high
Yaw misalignment above limit
Pitch system hydraulic pressure low
Cooling fan failure
Service interval exceeded